HomePortfolioAbout & TeamServicesOur ToolsNewsContact
Night aerial of the floodlit turf field and track at the TAAC Grounds athletic park
Featured Project Sport & Recreation · Design-Build

TAAC Grounds — Athletic Park

A fractured municipal tender, reimagined — Glenn Group's design-build approach turned an incomplete plan into an IAAF-calibre athletics facility, spending every dollar where it mattered most.

← All Projects

The project came to tender with an incomplete plan and a fractured approach. Our bid re-framed it — a single, integrated strategy that put the budget where the athletes are.

The TAAC Grounds athletic park was tendered by the municipality as a design-build project — but it arrived with an incomplete design and a scattered, piece-by-piece approach that risked spreading a finite public budget too thin. As part of our bid, Glenn Group did more than price the work in front of us: we proposed the key upgrades that would ensure the investment landed on the features that actually define an athletics facility — the track, the field, and the systems that keep them world-class.

Rather than tearing down and rebuilding from scratch, our strategy capitalized on the existing infrastructure — consolidating what was already in the ground with targeted, high-impact improvements. That single decision stretched the budget dramatically, redirecting money away from redundant reconstruction and toward the surfaces, drainage, and lighting that athletes and spectators feel every day.

The result is a complete, integrated athletic destination: a certified-calibre running track, a full-size synthetic turf field, grandstands and a press facility, engineered stormwater management, and high-quality sport lighting — all delivered as one coherent design-build, on budget.

The Approach

One strategy, spent where it counts

01

Re-framed the Bid

We took an incomplete plan and a fractured scope and proposed the key upgrades that would protect the investment — putting the budget on the athletic features that matter.

02

Built on What Existed

Instead of a full rebuild, we consolidated and upgraded the existing infrastructure — maximizing every public dollar rather than spending it on redundant reconstruction.

03

World-Class Standard

The finished facility meets IAAF-calibre athletics standards — a competition-ready track and field surface that performs for athletes and events alike.

04

Integrated Systems

Stormwater management, high-quality sport lighting, and site works were designed as one coordinated strategy — not bolted on afterward.

Daytime aerial of the completed athletic park showing the red track ringing the synthetic turf field

A complete facility, not a patchwork

Seen from above, the finished park reads as a single, intentional destination: an eight-lane track wrapping a full-size synthetic turf field, framed by grandstands, a press facility, and clean site circulation.

That coherence was the point. By consolidating the existing infrastructure into one integrated design rather than a series of disconnected upgrades, we delivered a facility that works as a whole — and left budget on the table for the features that define elite athletics.

Low-angle view down the numbered starting lanes of the resurfaced eight-lane track

Surfaces built for competition

The track and field are the heart of the investment. Our bid prioritized a competition-calibre running surface and a full synthetic turf field — the elements athletes, coaches, and event organizers actually judge a facility by.

Engineered stormwater management sits underneath it all, keeping the surfaces fast and playable through the region's weather and protecting the long-term value of the build.

The Site

Day and night, ready to compete

Night aerial of the floodlit TAAC Grounds athletics facility
We didn't rebuild what was already working — we consolidated it, upgraded it, and spent the budget where athletes feel it. That's how a fractured tender became a world-class facility.
Glenn Group
Night aerial of the floodlit field showing the reach of the new sport lighting

Lighting that extends the day

High-quality sport lighting was built into the strategy from the start — extending playable hours, supporting evening competition, and letting the community get far more use out of a single public investment.

It's the clearest expression of the whole approach: targeted, high-impact upgrades layered onto consolidated infrastructure, delivered as one integrated design-build.

TAAC Grounds athletic park

Planning a sport or recreation facility?

From reframing a tender to delivering a world-class field, we make public investments go further. Let's talk about your project.

Discuss your project